Revamping of 60 kV S/CDC substation power supply

Revamping alimentation poste Maroc

Category:

Renovation, modernization and extension projects

Client:

Lafarge Holcim

Date:

2024

Project details

The aim of this project is to modernize the power supply to the 60 kV S/CDC substation through a complete revamping. The work will upgrade the installations to guarantee enhanced performance, improved energy reliability and compliance with current standards.

  • Revamping of 60KVS/CDC substation power supply.

Challenges

  • Critical obsolescence of some existing distribution equipment.
  • Strictly limited network downtime.
  • Integration of new equipment into the existing single-line diagram.

Solutions

  • Systematic replacement with solutions compatible with current standards.
  • Site divided into phases with coordinated temporary shifts.
  • Adaptation engineering study and preliminary synchronization tests.