Adaptation work on the 60/22 kV RMEL substation

Adaptation work on the 60/22 kV RMEL substation

Category:

Renovation, modernization and extension projects

Client:

ONEE

Date:

2024

Project details

The work involved adapting the 60/22 kV RMEL substation in the province of Larache to new capacity and operating requirements. The work involved modifying equipment and cabinets, with specific connections to meet the new needs of the local network.

  • Adaptation of the 60/22KV RMEL Province larache substation.

Challenges

  • Need to keep the position in service during adaptation.
  • Wiring diagram different from initial configuration.
  • Access constraints for heavy equipment on a semi-urban site.

Solutions

  • Multi-stage production with partial service.
  • In-situ adjustment with engineering validation of modifications.
  • Reinforced logistical coordination with transporters and local authorities.
en_GBEN